Installed a new 3,000,000 BTU Engineered Air, Make Up Air system for Crown Metal Packaging.
New installation consisted of new roof penetration, roof curb installation, installation of new Engineered Air Unit, New duct installation, Electrical, Controls, and Gas Piping.